BLUESOLAR & PV: 50 MW evacuation using Power Electronics & Turbine (PPM/SPGM)

How to convert a standard PV installation into a baseload generator?

Use your awarded interconnection right (i.e 50 MW) and install aside of your existing PV installation more peak power of standard PV and a BlueSolar module as explained in the following picture. By doing this, you can maximize your project value and forget about low prices and curtailments since you will be covered by the storage and the baseload PPA.

 

 

Capex structure for 175 MW of installed capacity:

Financial Indicators
Baseload PPA
55€ / MWh
IRR Unlevered
10%
Capacity payments & Anciliary
40.000 €/MV/y & 7,5€/MWh
Inflation/Taxes
2%/25%

Hybridizing
the sun